The Penang Hill upgrades

Over the careful planning and studies carried out, we outline improvements around Penang Hill. These will not only restructure the image, but also build a whole new experience for the tourist's hot spot.

Phase One

Elevated Walkway
An alternative route to Astaka and Dataran Bukit Bendera
Retractable Roof
To provide convenience to tourists and visitors and enhance the lower station landscape.
Phase1 1
Phase1 2
Phase1 3
Phase1 4
Phase1 5
Phase1 6

Phase Two

Sky Walk & Lift
Penang Hill icon that provides easy access to KBB Bungalow for the elderly people and OKU to enjoy the extended deck.
View Decks & Gardens
Newly constructed view decks cover the 180-degree spectacular view of George Town and surrounding areas.
Holding Area
Extension of the Upper Station holding area for tourists convenience
Holding Area2
View Decks  Gardens2
Sky Walk

Phase Three

Phase Three was completed in 2018. This project is designed to cater to the number of visitors that come to Penang Hill especially during peak seasons such as School Holidays.
Phase3 01
Phase3 02
Phase3 03
Phase3 04
Phase3 05jpg















Completed Projects

Over the years, Penang Hill has completed a series of improvement activities. These activities resulted in transforming Penang Hill into one of today's hot spots in northern Malaysia.

2013 Projects

LED Lightings at Lower Station (Viaduct Walkway)

To beautify the Viaduct Walkway at lower station especially during night time
1
2

By Path A, B, C, D

Upgraded the walking trails on Penang Hill to provide more pleasure and a safer environment for the visitors and hikers.
1
2
3
4

Toilet Upgrades at Middle Station

Upgraded the toilet facilities in Middle Station for the hikers.
1
2
3
4

Rectractable Roof Canopy (Phase 1)

Upgraded the lower station with more sitting area (planter box) and Retractable Roof.
1
2
3

Lightings along the track

Installation of Light poles and Sport Light along the track.
1
2
3

Landscape along the Summit Road at Upper Station

Beautified the Summit Road with various plants and trees. Giving pleasure to the visitors who walk along the road.
1
2

2014 Projects

LED Signage

Installed an LED signage at the Air Itam roundabout
1
2

Upgrade Septic Tank

Upgrade the CST B (Sewerage System at Upper Station)
1
2

Covered Walkway

Upgrade the walkway with covered roof from Lower Station to On-Grid Park
1
2

Viewing Deck and Skywalk at Upper Station (Phase 2)

Build viewing deck and skywalk at upper station for visitors to enjoy the beautiful scene from Penang Hill
View Decks  Gardens2
Sky Walk

Heritage Walkway from Lower Station to Middle Station

Upgrade the heritage walkway and create a more comfortable path for the residents, workers and hikers.
1
2
3

Upgraded landscape along walkway next to the clinic near upper station

Beautified the walkway next to the clinic with more plants that suit the hill
1
2
3

2015 Projects

Holding Area

For the convenience of the funicular users, the holding area space was upgraded. The visitors will no longer worry about the hot weather
Holdingarea01
Holdingarea02
Holdingarea03
Holdingarea04

New Office at Multi-Storey Car Park

The new office is located at the highest level of the PBBPP building.
Phase4 1
Office01a
Office02a
Office03a
Phase4 2
Phase4 3
Phase4 4

2016 Projects

Refurbished Hillside Bungalow

Upgraded one of the heritage bungalows on Penang Hill
B1
B2
B3
B4

Refurbish PHC Guest House and Tulip House

These two houses were refurbished so that the staff of Penang Hill can enjoy the scenery and view of Penang Hill by staying up there.
Guesthouse01a
Guesthouse03a
Guesthouse04a
Guesthouse05a
Tuliphouse01a
Tuliphouse02a
Tuliphouse03a

New Roof at Lower Station Turnstile

The POS ticketing system that was implemented at Penang Hill Station requires a covered to the visitors’ comfort when exiting the funicular.
Roofturnstile01
Roofturnstile02

ByPath E,F,G,H,I,J

Upgraded the walking trails on Penang Hill to provide more pleasure and a safer environment for visitors and hikers.
BypathE1
BypathF
BypathG
BypathH
BypathI1
Bypathj1

The Little Village (Supported Project)

The surrounding area of The Little Village is designed to replicate the dwarf’s houses. The main attraction here is the bees and visitors can also purchase the honey that is sold here.
Beegallery03a
Beegallery01a
Beegallery02a
Beegallery04a

Earthquake And Typhoon Pavilion (Supported Project)

This place is designed to replicate the environment of typhoon and earthquake and also to memorize the tsunami that affected certain places in Malaysia.
Typhoon01a
Typhoon02a
Typhoon03a

2017 Projects

Toilet Upgrades

The toilet upgrades at Jalan Tuanku Yahya Petra, Penang Hill.

Project Start Date - 7 August 2017
Project End Date - 2 October 2017
Toilet1
Toilet2
Toilet3
Toilet4
Toilet5

Road Upgrades

Road upgrades along the way at Jalan Upper Tunnel

Project Start Date - 4 April 2017
Project End Date - 21 August 2017
U1
U2
U3
U4
U5

Playground Upgrades

Upgraded playground and create a more comfortable and safety playground for visitors

Project Start Date - 16/10/2017
Project End Date - 11/12/2017
IMG 3786
IMG 3787
IMG 3795

2018 Projects

Repaired Drains at Upper Station

Date: 10/07/2018 - 09/02/2019
Location: Along the way of Jalan Tunku Yahya Petra
HSMT8316
IMG 1626
IMG 1637
IMG 2664

Slopes stabilisation surrounding Middle Station of Penang Hill

Date: 11/09/2018 - 11/02/2019
Location: Middle Station Penang Hill
DSC 2234
IMG 1432
IMG 1433
IMG 1436

Slopes stabilisation surrounding Bel Retiro, Hindu Temple and Mosque Penang Hill

Date: 11/09/2018 - 11/05/2019
Location: Upper Station Penang Hill
FUKA9035
IMG 7134
IMG 7135
JWDD3724
KSCK5758

Slopes stabilisation on Upper Tunnel Road (Edgecliff Bungalow, KBB Bungalow, Funicular Road Tunnel Area and PHC Guest House)

Date: 29/10/2018 - 24/12/2018
Location: Upper Tunnel Road
AWDK6037
BBTT9838
ICNA4014
IJQX8951
JPXP6033

Repaired Drains at Upper Tunnel Road

Date: 29/10/2018 - 24/12/2018
Location: Upper Tunnel Road near to Rockies Bungalow
IMG 9844
IMG 9846
IMG 9849
IMG 9854

Repaired Drains from Tree Top Bungalow to Lower Tunnel Road

Date: 29/10/2018 - 24/12/2018
Location: Upper Tunnel Road near to Tree Top Bungalow
IMG 9564
IMG 9565
IMG 9568
IMG 9572

Repaired Upper Tunnel Road

Date: 12/09/2018 - 11/09/2019
Location: near Methodist Centre
IMG 5938
IMG 5943
IMG 5948
IMG 5951

Repaired wall along Viaduct East Road, Penang Hill

Date: 29/10/2018 - 26/11/2018
Location: Along Viaduct Road
DAQD4570
GBCP0999
HLBL1792
SJKI5127

Built wall at upslope in front of Earthquake Pavilion

Date: 29/10/2018 - 26/11/2018
Location: Facing Earthquake Pavilion
IMG 0260
IMG 0261
IMG 0262
IMG 0264

Repaired ByPath I and ByPath J

Date: 29/10/2018 - 24/12/2019
Location: ByPath I at Upper Tunnel road, ByPath J at Viaduct Road
IMG 6988
IMG 6993
IMG 6998
LQEF8064
SULJ4443
TNDD6394

Slopes repairs at ByPath A (Upslope)

Date: 29/10/2018 - 24/12/2018
Location: At Jalan Tunku Yahya Petra near ByPath A
IMG 1520
IMG 1526
IMG 1527
IMG 1533

Road repairs at Waterfall Road

Date: 29/10/2018 - 24/12/2018
Location: Next to Earthquake Pavilion
IMG 9592
IMG 9597
IMG 9602
IMG 9604

Slopes repairs at Viaduct West

Date: 12/11/2018 - 07/01/2019
Location: Road next to Methodist Center
GALI0665
IMG 5933
IMG 5934
PSTM5627

2019 Projects

Built Penang Hill Nursery

Date: 13/02/2019 - 11/05/2019
Location: In front of ByPath D
FQPK4038
GKWF0886
HYRP8972
JWNM5463
XTQN6249

Slopes stablelisation at Upslope and Downslope of Viaduct West, Penang Hill

Date: 12/08/2019 - 13/03/2020
Location: Upper Station
CHWE9573
CLKE3102
DJI 0911
DJI 0912
DJI 0924
DJI 0925
DJI 0932

Repaired slopes at Viaduct Road East and West

Date: 21/08/2019 - 13/11/2020
Location: Along Viaduct Road (CH850 - CH1200)
IMG 8999
IMG 9003
IMG 9006
IMG 9012
IMG 9014

Design and installation of rock netting and fencing along the railway track

Date: 17/09/2019 - 28/12/2020
Location: Along railway track
AENG6471
IMG 5986
IMG 6376
IMG 7826
IMG 8067

Slope stablelisation surrounding Upper Station

Date: 17/09/2019 - 29/05/2020
Location: Upper Station
BIQN7671
BUUO5579
DJI 0847
DJI 0856
DOJB6424
IMG 8853

Repaired road in front of Edgecliff Bungalow to Waterfall road

Date: 21/08/2019 - 13/11/2019
Location: from Waterfall road to Edgecliff Bungalow
IMG 6274
IMG 6275
IMG 6283
IMG 6285
IMG 6287

Slope stablelisation surrounding Edgecliff Bungalow

Date: 28/10/2019- 27/02/2020
Location: Edgecliff Bungalow at Upper Tunnel Road
DDYZ2307
EFGE9093
EJOU6310
JOLF5094
PSSQ4390

2020 Projects

Upgrades and repairs of monsoon drains from Viaduct Road West to Claremont

Date: 11/06/2020 - 03/09/2020
Location: Starting from Jalan Tunku Yahya Petra next to Viewing Deck to Upper Tunnel Road which next to Bungalow Tree Top
IMG 20200824 104158
IMG 20200824 104201
IMG 20200824 104208

Repaired damage drains

Date: 06/08/2020 - 16/09/2020
Location: Starting from Jalan Tunku Yahya Petra to Upper Tunnel road
1 (1)
1 (15)
1 (25)
1 (7)
1 (9)

Slopes stablelisation at CH1700-1750 AND CH1850-1950 of Viaduct West, Penang Hill (In Progress)

Date: 05/08/2020 - 06/02/2021
Location: Viaduct Road West

Reparing ByPath F, G & Heritage routes at Penang Hill (In Progress)

Date: 14/09/2020 - 07/12/2020
Location: Upper Tunnel road